OWP will be closed from 4:00 pm on Friday, December 20, 2024, until 8:00 am on Thursday, January 2, 2025, for Winter Break.
(All times are PST.)
For students in Canada: Due to the ongoing Canada Post strike, please use UPS or FedEx to return your scantrons for grading. You may take your exams online even if you received paper exams.
If exams are submitted: |
Course certificates will be mailed: |
By December 13th |
By December 20th |
After December 20th |
Early January |
Please note: Postmark dates will not be honored.
Water and Wastewater Terms Beginning B
A B C D E F G H I J K L M N O P Q R S T U V W Y Z
bedding grade
(1) In a gravity-flow wastewater collection system, pipe bedding is constructed and compacted to the design grade of the pipe. This is usually expressed as a percentage. A 0.5 percent grade would be a drop of 0.5 feet per 100 hundred feet of pipe. (2) Bedding grade for a gravity-flow wastewater collection pipe can also be specified as elevation above mean sea level at specific points.